Regal Homes Hackney

Hackney Road Redevelopment

Client: Regal Homes Ltd

Principal Contractor: Rye Demolition Ltd

Value: £700,000

Programme: 4 months

Overall recycle percentage: 87%

Contract completed on time and within the original contract budgets

Description

The new residential development required the demolition of the existing office, factory and commercial buildings which were bounded by major arterial traffic routes.  The asbestos contamination was removed by Rye and the mixed height office buildings had a full protection scaffold to the perimeter on the main thoroughfare. The demolition of the buildings and the removal of all the foundations was followed by a reduced level dig and the installation of a piling mat to the whole of the site. The piling mats were all constructed of material generated and recycled by the Rye Group on site.